Product Detail
Product Tags
Related Video
Feedback (2)
Our firm aims to operating faithfully, serving to all of our shoppers , and working in new technology and new machine regularly for engine driven welder, cummins genset, motorized transfer switches, All of the time, we have been paying attention on all information to insure each product or service glad by our customers.
China Perkins Overhaul Kits Suppliers – 4HT4.3-G22 SDEC Shanghai Engine Spare Parts Maintenance List Repair Overhaul – WINTPOWER Detail:
500Hours Maintenance Spare Parts List |
Item |
Description |
Part Number |
Qty |
1 |
CARTRIDGE,LUB |
S00012368 |
1 |
2 |
FILTER,FUEL |
D638-002-02 |
1 |
3 |
CLEANER,AIR |
K1833 |
1 |
1000Hours Maintenance Spare Parts List |
Item |
Description |
Part Number |
Qty |
1 |
CARTRIDGE,LUB |
S00012368 |
1 |
2 |
FILTER,FUEL |
D638-002-02 |
1 |
3 |
CLEANER,AIR |
K1833 |
1 |
4 |
Front Crankshaft Seal |
S00004645 |
1 |
5 |
Rear Crankshaft Seal |
D02A-118-02B |
1 |
6 |
BEARING,CRANKSHAFT THRUS |
S00004364 |
1 |
7 |
BEARING,MAIN |
S00004362 |
4 |
8 |
BEARING,MAIN |
S00004363 |
4 |
9 |
BEARING,CONNECTING ROD(UP) |
S00004365 |
4 |
10 |
BEARING,CONNECTING ROD (LOW) |
S00004366 |
4 |
11 |
PISTON RING |
S00011631 |
4 |
12 |
PISTON RING |
S00011630 |
4 |
13 |
OIL RING |
S00000975 |
4 |
14 |
FAN BELT |
S00017994 |
1 |
15 |
ROCKER ARM CASE SEAL RING |
S00005034 |
1 |
16 |
FUEL INJECTOR |
S00014184 |
4 |
3000Hours Maintenance Spare Parts List |
Item |
Description |
Part Number |
Qty |
1 |
CARTRIDGE,LUB |
S00012368 |
1 |
2 |
FILTER,FUEL |
D638-002-02 |
1 |
3 |
CLEANER,AIR |
K1833 |
1 |
4 |
BEARING,CRANKSHAFT THRUS |
S00004364 |
1 |
5 |
BEARING,MAIN |
S00004362 |
4 |
6 |
BEARING,MAIN |
S00004363 |
4 |
7 |
BEARING,CONNECTING ROD(UP) |
S00004365 |
4 |
8 |
BEARING,CONNECTING ROD (LOW) |
S00004366 |
4 |
9 |
PISTON RING |
S00011631 |
4 |
10 |
PISTON RING |
S00011630 |
4 |
11 |
OIL RING |
S00000975 |
4 |
12 |
TAPPET |
S00002893 |
8 |
13 |
BUSHING, CAMSHAFT |
S00004367 |
1 |
14 |
CAMSHAFT |
S00006208 |
1 |
15 |
ROD,ENGINE CONNECTING |
S00001412 |
4 |
16 |
TENSIONER ,BELT |
S00004136 |
1 |
17 |
THERMOSTAT |
S00003087 |
1 |
18 |
PUMP,LUBRICATION OIL |
S00003090 |
1 |
19 |
PUMP,WATER |
S00003086 |
1 |
21 |
ROD,PUSH |
S00002892 |
8 |
22 |
LINER,CYLINDER |
S00001197
1-S00008938白
2-S00008939黑 |
4 |
23 |
PISTON,ENGINE |
S00011799 |
4 |
24 |
PIN,PISTON |
S00001198 |
4 |
25 |
RING,RETAINING |
B00001037 |
8 |
26 |
ORIFICE, PISTON COOLING JET |
S00004685 |
4 |
27 |
VALVE,INTAKE |
S00002885 |
8 |
28 |
VALVE,EXHAUST |
S00002886 |
8 |
29 |
FAN BELT |
S00017994 |
1 |
30 |
GASKET,VALVE COVER |
S00005034 |
1 |
31 |
GASKET,OIL COOLER CORE |
S00004864(与机体连接) |
1 |
32 |
GASKET,OIL COOLER CORE |
S00004865(自身盖板连接) |
1 |
33 |
O-RING |
S00004986(调压阀密封) |
1 |
34 |
GASKET,CYLINDER HEAD |
S00000844 |
1 |
35 |
SPHERICAL WASHER |
B00000973(喷油器密封处) |
4 |
36 |
MOTOR,STARTING |
S000012976 |
1 |
37 |
ALTERNATOR |
S00012977 |
1 |
38 |
FUEL INJECTOR |
S00014184 |
4 |
39 |
PUMP,FUEL INJECTOR |
S00000285 |
1 |
40 |
CORE,COOLER |
S00003083 |
1 |
41 |
ELECTRONIC GOVERNOR ASSY |
S00012543 |
1 |
41.1 |
SENSOR, SPEED |
S00011542 |
1 |
41.2 |
CONTROL ASSY, ELECTRONIC GOVERNOR |
S00011409 |
1 |
41.3 |
CONTROL ASSY, ELECTRONIC GOVERNOR |
S00008903 |
1 |
41.4 |
WIRING HARNESS, ELECTRONIC GOVERNOR |
S00004830 |
1 |
42 |
TURBOCHARGER ASSY |
S00014383 |
1 |
Product detail pictures:
Related Product Guide:
We are experienced manufacturer. Wining the majority of the crucial certifications of its market for China Perkins Overhaul Kits Suppliers – 4HT4.3-G22 SDEC Shanghai Engine Spare Parts Maintenance List Repair Overhaul – WINTPOWER , The product will supply to all over the world, such as: Rome, Guinea, Lisbon, If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.
As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
By Bernice from Bangladesh - 2018.11.22 12:28
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
By Ricardo from Mexico - 2017.09.29 11:19